FEATURED PROJECTS

Berkley Heights

Multiple phases of The Berkley Heights residential development were constructed to provide both single family and multi-family housing in Spirit Lake, Iowa. This project included the construction [...]

Milford – H Avenue

This project included reconstruction of H Avenue from 6th Street to 10th Street in the City of Milford, Iowa.  The project consisted of removal of the existing street and underlying [...]

Jones Trail – Dickinson County

This project involves the design, survey, supervision of bid letting, contract administration, construction staking, and inspection of a recreational trail on the northeast side of Big Spirit [...]

Arnolds Park Promenade at Preservation Plaza

Design of the project was completed in 2018/2019 and construction was completed in 2019.  Beck Engineering, Inc. provided the civil engineering and land surveying services for the project.  The [...]

Okoboji Track + Field

Construction on this project began in the Spring of 2019 and was completed before the 2019 Fall football season. This project replaced the existing grass surface with a new field turf surface, [...]

State Pier at Arnolds Park Amusement Park

The State Pier renovation project will create a dynamic plaza space connecting two phases of the boardwalk project currently underway, creating a focal point at the terminus of Arnolds Park [...]

City of Terril Wastewater Lagoon Renovation

The services of Beck Engineering, Inc. were retained to evaluate the existing sanitary sewer system for the City of Terril, Iowa due to several non-compliance notices they received from the Iowa [...]