Multiple phases of The Berkley Heights residential development were constructed to provide both single family and multi-family housing in Spirit Lake, Iowa. This project included the construction [...]
This project included reconstruction of H Avenue from 6th Street to 10th Street in the City of Milford, Iowa. The project consisted of removal of the existing street and underlying [...]
This project involves the design, survey, supervision of bid letting, contract administration, construction staking, and inspection of a recreational trail on the northeast side of Big Spirit [...]
Design of the project was completed in 2018/2019 and construction was completed in 2019. Beck Engineering, Inc. provided the civil engineering and land surveying services for the project. The [...]
Construction on this project began in the Spring of 2019 and was completed before the 2019 Fall football season. This project replaced the existing grass surface with a new field turf surface, [...]
The State Pier renovation project will create a dynamic plaza space connecting two phases of the boardwalk project currently underway, creating a focal point at the terminus of Arnolds Park [...]
The services of Beck Engineering, Inc. were retained to evaluate the existing sanitary sewer system for the City of Terril, Iowa due to several non-compliance notices they received from the Iowa [...]
This project was designed in 2013 and built in 2014. The project involved the reconstruction of 15th Street from Hudson Avenue to Hill Avenue in the City of Spirit Lake. The project had a [...]