This project was designed in 2020 and constructed in 2021. The project involved 1,600 linear feet of 30-foot-wide concrete street reconstruction of Springbrook Drive in Hinton, Iowa. The project scope included installation of a temporary access road for resident accessibility, reconstruction of the existing street, subdrain installation, storm sewer improvements and paved driveway connections.